Half of this roof was reroofed using Duro-Last membrane. The Chanels in the metal roof were filled with insulation perimeter framed in to allow for flashing.
half duplex reroofed with two ply IKO TORCHON
Reroofed using Duro-Last single ply membrane system
Description
Half of this roof was reroofed using Duro-Last membrane. The Chanels in the metal roof were filled with insulation to allow for installation...
24 gauge standing seam metal roofing system designed to rust. This picture shows the Capping detail what is not visible is the Z bar and screen
24 gauge standing seam with peel and stick underlay and ventilated ridge system.